Wednesday, 15 October 2014

engine rebuild complete & gearbox connected

finished rebuilding the oil pump and fitting the sump, after which it was time to connect the gearbox, which, due to the layout of flywheel and clutch being at the back of the gearbox, should be the first and only time the engine and box need to be connected. They can stay together from now on... :-)

pictures:




This picture makes me pleased with how far I've come already!

Ferrari 360 fuel rails are fitted and also get some of the gold foil treatment.

No comments:

Post a Comment